Replus intends to make available dedicated BESS production capacity of 1.5 GWh – 2 GWh over a two-year period to support the evolving energy requirements of telecom infrastructure.

View PDF

Replus intends to make available dedicated BESS production capacity of 1.5 GWh – 2 GWh over a two-year period to support the evolving energy requirements of telecom infrastructure.